Counting the findings…
| Lot | 8,082 sf · 0.19 ac |
| Year built | 1961 |
| Living area | 2,025 sf |
| APN | 112-14-107 |
| Owner, deeds, value | Report |
| Comparable sales | Report |
No setbacks are published for this district yet. The adopted code is the authority.
| Buildable area | Report |
| Existing structures | Report |
| Flood zone | Report |
| Easements and drainage | Report |
| Sewer or septic, water | Report |
| Streets and surroundings | Report |
| Permit history | Report |
| Path to permit, City of Phoenix | Report |
Sources checked: the county parcel record, the zoning district and its code, and the parcel outline.
| Documents | Report |
| HOA and CC&Rs | Report |
| Due diligence checklist | Report |
| Exhibits | Report |
| Report |
| Addition or second story | Report |
| Guest house, ADU | Report |
| Lot split | Report |
| Rebuild | Report |
No setbacks are published for R-3 yet. The adopted code is the authority.
| 1. FARO 3D Laser Scan The existing house is laser scanned in a day, then drawn as it stands. Design starts from those drawings. | 1 wk |
| 2. As-Built | 1 wk |
| 3. Design drawings | 5 wk |
| 4. MEP engineering | 4 wk |
| 5. City plan review and permit | 13 wk |
No setbacks are published for R-3 yet. The adopted code is the authority.
| 1. FARO 3D Laser Scan The existing house is laser scanned in a day, then drawn as it stands. Design starts from those drawings. | 1 wk |
| 2. As-Built | 1 wk |
| 3. Design drawings | 5 wk |
| 4. Structural engineering | 4 wk |
| 5. MEP engineering | 4 wk |
| 6. City plan review and permit | 13 wk |
No setbacks are published for R-3 yet. The adopted code is the authority.
| 1. Topographic survey A licensed surveyor maps the boundary, grades and what stands on the lot. Design starts from it. | 3 wk |
| 2. Site plan | 2 wk |
| 3. Design drawings | 5 wk |
| 4. Structural engineering | 4 wk |
| 5. MEP engineering | 4 wk |
| 6. City plan review and permit | 13 wk |
No setbacks are published for R-3 yet. The adopted code is the authority.
| 1. Topographic survey A licensed surveyor maps the boundary, grades and what stands on the lot. Design starts from it. | 3 wk |
| 2. Soils investigation | 3 wk |
| 3. Site plan | 2 wk |
| 4. Design drawings | 5 wk |
| 5. Structural engineering | 4 wk |
| 6. MEP engineering | 4 wk |
| 7. Grading and drainage | 4 wk |
| 8. City plan review and permit | 13 wk |
No setbacks are published for R-3 yet. The adopted code is the authority.
| 1. FARO 3D Laser Scan The existing house is laser scanned in a day, then drawn as it stands. Design starts from those drawings. | 1 wk |
| 2. As-Built | 1 wk |
| 3. Design drawings | 5 wk |
| 4. Structural engineering | 4 wk |
| 5. MEP engineering | 4 wk |
| 6. City plan review and permit | 13 wk |
Counted from the public record for this lot.